High qualification and rich experience of our engineers enabled their successful participation in designing, engineering, erection, commissioning, factory and witness tests, servicing, troubleshooting and repair as well as enhancement, search and fault handling of various kinds of electrical equipment in Ukraine and in range of countries near and far abroad, on power plants of all types (HPP, PSPP, TPP and NPP) and on distribution substations and industrial objects.

FOREIGN OBJECTS

HPP “Gazi Baroza” (Pakistan)

2003: Erection supervision, commissioning of processor-based excitation systems type UNITROL® P of fife hydro units 294 MW

ghazi-barotha-hpp-1c.jpg ghazi-barotha-hpp-2c.jpg ghazi-barotha-hpp-3c.jpg ghazi-barotha-hpp-4c_0.jpg

HPP “Thak Ba” (Vietnam)

2004: Erection supervision, commissioning of electrical equipment, control equipment and automation of the hydrounit 20 MW
2005: Performing measuring works of the building of Pressure Station Node and project of the reconstruction repair of the hydrounit №3
2006: Erection supervision, commissioning works at repairing of hydrounit №1
2010: Commissioning and start-up works after performance of rehabilitation of hydrounit # 3
OLYMPUS DIGITAL CAMERA         OLYMPUS DIGITAL CAMERA         OLYMPUS DIGITAL CAMERA

China PP

2004-2009: Commissioning, putting into operation and servicing of processor-based excitation systems type UNITROL® on HPP Touketuo III; HPP Hebi; PSPP Taian; HPP Ginjie; HPP Wangqu; HPP Huanghua; HPP Pingwei; HPP Daihai II; HPP Sanhe II; PSPP Zhanghewan, PSPP Yixing

Heat Station DAIHAI

daihai_1.jpg daihai_3.jpg daihai_2.jpg daihai_4.jpg

HPP ERTAN

ertan_1.jpg ertan_3.jpg ertan_2.jpg img_0078.jpg

Heat Station FEIXIAN

feixian_2.jpg feixian_1.jpg feixian_3.jpg

Heat Station KINBEY

qinbei_5.jpg qinbei_1.jpg qinbei_2.jpg qinbei_3.jpg qinbei_4.jpg

PSPP TAIAN

OLYMPUS DIGITAL CAMERA OLYMPUS DIGITAL CAMERA SAMSUNG DIGITAL CAMERA SAMSUNG DIGITAL CAMERA
SAMSUNG DIGITAL CAMERA SAMSUNG DIGITAL CAMERA

Heat Station TAYSHAN

taishan_7.jpg taishan_3.jpg taishan_6.jpg taishan_5.jpg

Heat Station ZHANGHEWAN

zhenjiang_1.jpg zhenjiang_2.jpg


NPP “Kaiga-3”, NPP “RAPP-5, 6” (India)

2007; 2009: Erection supervision and commissioning of processor-based excitation systems type UNITROL® 5000
2007, 2009, 2010: Erection supervision, commissioning, putting into operation of processor-based excitation systems UNITROL® 5000

Pumping station “Nassiria” (Iraq)

2008: Electromounting and commissioning works at switchgear 6 kV and drainage units(12pcs) with synchronous electric motors 6 kV, 1,2 MW

HPP “San-Carlos” (Colombia)

2003: Commissioning of adaptive voltage changer of excitation systems of 8 hydrounits

HPP “Darunta” “Afghanistan”

2008-2009: Organization, consulting, dismounting, mounting, enable, commissioning and engineering supervision of electrical equipment. Project designing, armory, manufacturing and commissioning of processor protection, automatics and control panel for hydrounits #1-3.

Саудовская Аравия

2009-2010: Пуско- наладочные работы процессорных систем возбуждения типа UNITROL ЭС Курая; Газлан; Аль Фжоуф

Zeiskaya HPP (Russia)

2008: Works on commissioning of the thyristor excitation system installed on the hydrounit №2 with capacity 215 MW

Saratov HPP (Russia)

2003: Performance of adaptation project of digital excitation systems “Research Institute Electromash” for 8 hydrounits with capacity 60 MW to the operative schemes, putting into operation 4 excitation systems for 8 hydrounits.

Shaturskaya PP (Russia)

2004: Putting into operation of one brushless analog-digital excitation system type “Kosur” “Research Institute Electromash” on the unit with capacity 220 MW

Knyazhegubskaya HPP (Kolsk peninsular, Russia)

2005: Adaptation project for digital excitation system СТС-МР “Research Institute Electromash” to the operating schemes

Svetlinskaya HPP (Yakutia)

2009: Industrial services about thyristor excitation system UNITROL® 5000 of the hydro unit №2 because of card UNS 288ОВ-Р replacement

Pavlovskaya HPP (Bashkiria)

2004: : Erection supervision, commissioning of processor-based excitation systems type UNITROL® 5000 of 4 turbo units 50 MW
2006-2009: Servicing of thyristor excitation systems
2008: Reconstruction of the thyristor excitation system UNITROL® 5000 of the hydro unit №1.Tuning off current sensors in CROWBAR circuit from laying on hydro unit’s №1-4. Servicing of static excitation system UNITROL® 5000 hydro unit #4.
pavlovskaya1.jpg pavlovskaya3.jpg pavlovskaya2.jpg pavlovskaya4.jpg
pavlovskaya_5.jpg pavlovskaya_6.jpg

Heat Station -2 (Riga, Latvia)

2003: Erection supervision, commissioning of processor-based excitation systems type UNITROL® 5000 of 2 turbo units 100 MW

Electrinaiskaya Heat Station (Lithuania)

2008: Commissioning of excitation system UNITROL® 5000

Mazheikskaya Heat Station (Mazheikyu, Lithuania)

2005: Erection supervision, commissioning of processor-based excitation systems type UNITROL® 5000 of turbo units #1,2 100 MW

PSPP “Kruonis” (Lithuania)

2006: Commissioning of processor-based excitation systems type UNITROL® 5000

Heat station-2 (Alma Ata, Kazakhstan)

2004: Designing, erection supervision, commissioning of processor-based excitation systems type UNITROL® 5000 of turbo unit 100 MW
2009: Engineer servicing of operating excitation system turbo unit #6: functioning testing of local control panel, remote control, service panel: checking of unit work in network; checking at free running.

Kazakhstan PPS

2006-2007: Emergency recovery, erection supervision, commissioning of processor-based excitation systems type UNITROL® 5000

HPP Vartsuhe (Georgia)

2008-2009: Project, dismounting and mounting works of electrical equipment. Mounting and commissioning works, testing in frame of execution of reconstruction of hydrounit #2
gruzija_2new_big.jpg gruzija_3b.jpg gruzija_4b.jpg

Gissarakskaya HPP (The Uzbekistan Republic)

2008: Erection supervision and commissioning of turbine electrical equipment, valve, OPU, speed regulator, automatic control system

Heat Station in Baku (Azerbaijan)

2001-2002: Commissioning of processor-based excitation systems type UNITROL® 5000 on turbo unit 500 MW of gas-turbine complex

Kishenev Heat Station-2 (Moldova)

2001-2002: Commissioning of three excitation systems type UNITROL® 5000
2003-2005: Erection supervision and commissioning of three excitation systems type UNITROL® 5000 for three turbo units 100 MW
2004 -2009: Servicing of excitation system UNITROL® 5000
chisinau-1c.jpg chisinau-2c.jpg chisinau3s.jpg chisinau4s.jpg
chisinau5s.jpg OLYMPUS DIGITAL CAMERA

Ukrainian Sites

Power Plants

Tashlukskaya PSPP (Yuzhnoukrainsk)

2002-2003: Together with “Ukrhydroproject” company (Kharkiv), manufacturing plants: “Research Institute Electromash” and “NEVAelectromash”(St.-Petersburg), “Ansaldo-EI”(Moscow), “Hartron”(Kharkiv) were performed works on designing of engineering solutions of technical support of automation systems and protection device of hydrounits.
2005 -2007:Testing of power equipment such as generators 225 MW, closed current distributors and switching units 15,75 and 6 kV. Performing of commissioning works of the automation systems and excitation system of hydrounits # 1,2, the auxiliaries 6 and 0,4 kV. Technical engineering of thyristor autoexcitation systems СТС-370/2000-2,5-УХЛ4 Hydrounit
2008: Capital repairs of equipment of thyristor autoexcitation systems СТС-370/2000-2,5-УХЛ4 Hydrounit №2. Technical engineering of relay protection and automatics of switchgear – 6 kV
2009: Correcting of the unit controller algorithms АЩУ1 и АЩУ2 for automation work mode realization of hydrounits №1,2
Technical servicing of excitation systems of excitation systems hydrounits #1,2. Repairs of electrical equipment КНС-2. Repairs of electrical equipment АСУ-ТП. Commissioning of power electrical equipment of protection and automatics systems of two hydrounits.

2010: Repairs of electric distribution and control equipment: update of switching facilities of gas insulated circuit breakers 1QM, 2 QM, maintenance of static frequency converter ТПП-15,75/1000-УХЛ4, maintenance of open switchgear-330 kV, maintenance of turbine automatics 1GM, 2GM
201551_3f413fb2.jpg gaes_tashlyik.jpg

Aleksandrovskaya HPP (Yuzhnoukrainsk)

2007: : Capital repairs of the electrical equipment of relay protection and automatics of switchgear 10kV, of the excitation systems and DC board. Routine repairs of hydrounit #1. Capital repairs of hydrounit #2
2008: Repairs of the alarm and thermal control equipment of the hydrounit №1. Capital repairs of the electro automation system of the hydraulic unit №1. Capital repairs of hydrounit #2.
2009: Capital repairs of the alarm and thermal control equipment of the hydrounit № 2
2010: General maintenance of hydroautomatics, Hydrounit #2, electric annex of oil pressure unit, Hydrounit #2, electric annex of control system, hydrounit #2 and excitation system, hydrounit #1

Kurahov TPP “Vostocenergo” Ltd

2007: IInspection of the excitation system of the generator TGV-200M with exciter ВТС 420-2/2-3200/96+24 power unit №7 CRC.
2008: Developing of operating documentation of adapting of new thyristor excitation system of generator TGV-200M (manufactured by “Preobrazovatel”, Zaporizhzhya) demounting works, construction-and-assembly works, commissioning and testing
2009: modernization of hydrounit of ТГВ-200М type (thyristor excitation system) manufactured by NPO “Electotyajmash”, unit #7 (development of design documentation on adaptation of excitation system, dismounting, mounting, commissioning and start-up works)
2010: replacement or electrolysis СЭУ-20 and rectifier ТПВ-1250-115 УХЛ4-11 (mounting/dismounting of the equipment). Replacement of motor-generator by rectifier (mounting/dismounting/commissioning)

Zuev TPP

2009: Project Development for replacement of electromotor feed pump. Demounting of details, nodes, mechanisms of electromotor feed pump of power unit #1, performance of electromounting works, commissioning and testing of electrical equipment, complex testing of electrical equipment work.

Hydro Power Plants of Dnipro CASCADE OJSC “Urkhydroenergo”

1997-2004: Commissioning of 41 microprocessor-based excitation systems type UNITROL® P on the HPPs of Dnipro CASCADE (Kiev, Kahovka, Kremenchug, Dneprodzerzhunsk, Dnipro-1, Dnipro-2)
2005: Servicing of microprocessor-based excitation systems type UNITROL-P installed on the hydro units of HPPs of Dnipro CASCADE. Electro mounting and commissioning works at rehabilitation of special gantry crane of Dnipro HPP.
2006: Servicing of excitation systems type UNITROL® of hydro units #5,6 Dneprodzerzhunsk HPP; commissioning of gas insulated breaker on open switchgear-150;
2007: Commissioning of gas insulated breaker on open switchgear-330 Dneprodzerzhunsk HPP;
2008: Development of operating documentation on adaptation of beckets of secondary commutation at replacement of excitation systems of hydro units № 1, 2, 5, 6, 7, 8 Kiev HPP. Wedging of rotor hydro unit #2. Reconstruction of auxiliary electrical systems of pneumatic husbandry with replacement of compressors on Kremenchug HPP (Svetlovodsk). Development of operating documentation on adaptation of beckets of secondary commutation at replacement of excitation systems of hydro units # 1,2, 4 in frames of reconstruction of Dnestr HPP (2nd stage). Commissioning of equipment on Dnestr PSPP, performance of researching and commissioning tests of main hydro unit sample and equipment of commissioning scheme.
2008-2009: Replacement of compressors, reconstruction of pneumatic husbandry, commissioning works, mounting of power assembly on Dneprodzerzhunsk HPP.
2009: Development of operating documentation on adaptation of beckets of secondary commutation at replacement of excitation systems of hydro units #3 of Kiev PSPP. Reconstruction of electro technical part of hydro unit Г-2, installation and enabling of turbine and generator Г-2 control devices, automation of drainage system, electric power supply and installation of current relay current replacement of technical excitation systems, auxiliary electro mounting works Г-2 Kremenchug HPP (Svetlovodsk, Ukraine).
2010: Kakhov HPP: Technical support at putting into operation of excitation system manufactured by Alstom, hydrounits #5,6
Kanev HPP: Rehabilitation of electric annex. Circuit breaker B-330-2; Rehabilitation of electric annex. Isolator ШР-330-IV-В-2; Rehabilitation of electric annex. Isolator ШР-330-1-И-2
Kremenchyg HPP: performance of set of works on 2nd stage rehabilitation of auxiliary technological systems of compressor plant pneumatic husbandry.
001.jpg 0099.jpg 0094.jpg 0095.jpg
0096.jpg 0097.jpg 0098.jpg 00992.jpg

Substations 330 kV

Substation 330 kV Oktyabrskaya (Kiev)

2003-2004: Commissioning works of electrical equipment box.
2005: Commissioning works of the protections and automatics of 6 lines 110 kV at switching supply.
Commissioning works of the information-diagnostic complex “Regina”
2006: Electromounting works at replacement of relay protection and automatics devices

Substation 330 “Novokievskaya”

2006: Electromounting and commissioning works of automatics panel.
2007: Equipment delivery, electromounting and commissioning works (automatics panel В 330 ТП ТЕ С1).
2008: Commissioning works on capital repairs of air-circuit breaker ВВБ-330Б.
2009:Mid-life repair of air-circuit breaker ВВБ-330-II.

Substation 330 “Dnipro-Donbas”

2006: Commissioning of the control and automatic schemes with gas-insulated circuit breakers

Substation 330 “Belotserkovskaya”

2007: Performing of the mounting and commissioning works of the protections distribution.

Substation 330 “Nezhun”

2004: Commissioning of electrical equipment, relay protection and automatics devices and fire fighting of autotransformer -1.

Substation 330 “Brovaru”

2008: Commissioning works on capital repairs of air-circuit breaker ВВБ-330Б.

2010: Preventive testing of electric equipment in building of Zaporizhzhya branch

Substations 110 kV

Substation 110 “Motocycling” (Kiev)

2006: Electromounting works at replacement of relay automatics and protection devices

Substation 110 “Tatarskaya” (Kiev)

2006: Electromounting works at replacement of relay automatics and protection devices

Substation 110/6 kV “Yuzhnaya” (Kiev)

2004: Indoor switchgear-6 kV. Implementation of the photothyristor arc protection system – projecting, electrical mounting and commissioning works.

Substation 110 “Obolonskaya”, “Levoberezhnaya”, “Yuzhnaya” (Kiev)

2008: Breakers repairs 110 kV

Substation 110 Buryakovka (Chernobyl NPP region)

2007: Performance of commissioning works. Engineering service and repairs of power distribution and control devices of Transformer Substation 110/10 kV (open distribution device 110 kV; closed distribution device 110 kV; accumulator, Complete Transformer Substation, lines 10 kV). Testing of relay protection and automatics devices of Substation 119 kV of manufacturing complex “Vector”.
2008: Engineering servicing of electrical equipment of Transformer Substation 110/10 kV Buryakovka (open distribution device 110 kV; closed distribution device 110 kV; accumulator).
2009: Engineering servicing of protection lines 110 kV

INDUSTRIAL ENTERPRISES

OJSC “Zaporozhstal” (Zaporizhzhya)

2003: Commissioning of electrical equipment, relay protection and automatics devices of Substation-150 kV “M-3”.
2005: Performance of commissioning works at reconstruction of open distribution device-154 kV Substation-150 kV “M-3”.

OJSC “Grafit” (Zaporizhzhya)

2004: Commissioning of electrical equipment, relay protection and automatics devices in the frames of reconstruction of substation 150/35/6 kV “Grafit”

Factory “A. Staki-Reil” Ltd (Malin, Zhytomyr region)

2004: Mounting of distribution equipment, capacitor banks, intradepartmental distribution of power cable networks, electrical networks, enabling of technological equipment, installation of lightning equipment, commissioning works in the frames of performance of works on electric power supply of isothermal part of the factory.
2005: Mounting of the electric power supplying and illumination networks of the isothermal section. Performing of the starting-up and adjustment works.
2008-2009: Testing and commissioning works of electrical equipment

Cathode protection station, State concern “Ukrtransgaz” NSC “Neftegaz Ukraine”

2006: Electromounting works on electric power supply on the station of cathode protection.

Central PP NEK “Urkenergo” (Odessa)

2008: Construction and assembling works on performance of joint dispatcher control and operating communications systems of Central PP NEK “Urkenergo”

OJSC “Concern Stirol”

2008: Commissioning of excitation systems ШСВ-3 under no-load conditions and under network connestion.

OJSC Kiev region base of Material Logistics and service support “Oblagrotehservice”(Vushneve, Kiev region)

2008: Equipment supply, mounting, commissioning works of transformer substation 10/0.4 kV
2009: Works on reconstruction of electrocable line

National Bank of Ukraine

2008: Repairs of power transformer 26 MW T-2 type ТРДН-25000/110 Substation “Almaz” and engineering service of Substation КТП-2х1600-10/0,4
2010: Preventive testing of electric equipment in building of Zaporizhzhya branch

Children and youths’ sport school (Vushgorod, Ukraine)

2008: Development of construction documents for reconstruction of swimming pool in Children and youths’ sport school in Vushgorod.

Production complex “Artec” (Demidov, Kiev region)

2006: Electromounting and commissioning works 10 and 0.4 kV at complex electric power supply facilities.

OJSC “Hydromechanizatsiya”

2008: Performance of commissioning works of electrical equipment 6 kV for dredge feeding and pumping station of hydroinwash in the microdistrict “Osokorki Central”.

SJSC “Titan” (AR Crimea, Armyansk)

2003: Commissioning of the electrical equipment, control equipment and automation of the power plant 6 MW in the frames of building PP on SJSC “Titan”.

OJSC “Korosten plant of chemical machinery construction”

2010: Testing of relay protection devices of 4 feeders 10 kV in the central distribution center on the plant (ЦРП-10) in the scope of preventive updating according to Branch Governing Document 34.35.603-95

News

    April 2011
    Hydrounit #3 on HPP “Thak-Ba” (Vietnam) was put into warranty experimental-industrial operation. >>

    29 March 2010
    Hydrounit #2 of HPP Vartsyhe in Georgia was successfully put into operation. >>

    4 May 2009
    In May, 2009 company PNS began works on HPP “Vartsyhe” (Georgia). >>

    29 November 2009
    PNS specialists started works on one of the oldest Afghan HPP >>

    15 March 2009
    PNS completes the works at Kurakhovskaya TPP >>