Specialization

Basic directions of our company’s activities are:

Commissioning works of electrical equipment of fuel-energy complex enterprises, industrial enterprises and social sphere;

Electromounting works of electrical equipment, external and internal engineering networks, systems, measuring devices and instruments;

Preventive maintenance of electrical equipment of any complexity during all tenure of employment according to service plans of manufacturers;

 

Our engineers have big experience in execution of works with following kinds of electrotechnical equipment:

  1. Synchronous generator up to 600 MW and AC motors, distribution and rectifier transformers (dry and oil immersed) up to 330 kV, measuring transformers;
  2. Microprocessor-based excitation systems for turbo- and hydrogenerators of any power;
  3. Power electronics equipment such as controlled AC drives and static starting devices;
  4. Microprocessor-based protection systems of electrical equipment of stations and substations;
  5. Power electric apparatus such as oil immersed, electromagnetic, vacuum and gas insulated breakers, grounding devices, disconnectors, shorting devices and switches of low, medium and high voltage
  6. Switchgears for both indoor and outdoor installation from 0,4 to 330 kV;
  7. Electric apparatus, secondary circuitry and wiring up to 1000 V;
  8. Power cable lines and bushings.

Also, our Company specializes on performance of designing works of external and internal engineering networks, systems and constructions; technical design; render engineering service connected with delivery, mounting, commissioning of electrical equipment of different complexity under our own projects and under projects of other companies.

News

    April 2011
    Hydrounit #3 on HPP “Thak-Ba” (Vietnam) was put into warranty experimental-industrial operation. >>

    29 March 2010
    Hydrounit #2 of HPP Vartsyhe in Georgia was successfully put into operation. >>

    4 May 2009
    In May, 2009 company PNS began works on HPP “Vartsyhe” (Georgia). >>

    29 November 2009
    PNS specialists started works on one of the oldest Afghan HPP >>

    15 March 2009
    PNS completes the works at Kurakhovskaya TPP >>