Partners

Our company maintains close partner relations with range of world-leading electro technical companies such as:

  • ABB Switzerland Ltd (Turgi): Our specialists perform works on development of project of adaptation, erection supervision, commissioning, after-sale service of processor excitation systems type UNITROL®
  • Siemens (Germany): Mounting, commissioning of protection systems manufactured by Siemens
  • Schneider Electric (France): Erection supervision, commissioning of electrical equipment 10-0,4 kV manufactured by Schneider Electric
  • AIP (Afghanistan International Power  Corporation) (Afghanistan): performance of rehabilitation project, manufacturing of protection control panel, electromounting and commissioning works of automation systems of hydrounits on HPP Darunta.
  • ANHAM (USA): performance of rehabilitation project, manufacturing of protection control panel, electromounting and commissioning works of automation systems of hydrounits on HPP Darunta.
  • Mosenergo (Russia)
  • NEVAElectromash (Russia): performance of works on development of project of adaptation for reconstruction, commissioning and  putting into operation of excitation systems manufactured by NEVAElectromash
  • Promautomatica (Russia)

 

Also our company cooperates with big Ukrainian companies and on terms of subcontract and general contract performs works on rehabilitation and modernization of power sites in Ukraine and in near and far abroad countries.

    • Electrotyazhmash - Ukraine
    • Kievenergo  – Ukraine
    • Ukrinterenergo – Ukraine
    • Ukrhydroenergo – Ukraine
    • Ukrhydroproect – Ukraine
    • Turboatom – Ukraine
    • GasenergocomplectUkraine
    • Union - Ukraine
    • Yuzhnoukrainskaya NPP - Ukraine
    • Spetshydromontazh – Ukraine

News

    April 2011
    Hydrounit #3 on HPP “Thak-Ba” (Vietnam) was put into warranty experimental-industrial operation. >>

    29 March 2010
    Hydrounit #2 of HPP Vartsyhe in Georgia was successfully put into operation. >>

    4 May 2009
    In May, 2009 company PNS began works on HPP “Vartsyhe” (Georgia). >>

    29 November 2009
    PNS specialists started works on one of the oldest Afghan HPP >>

    15 March 2009
    PNS completes the works at Kurakhovskaya TPP >>